Banner Banner
About Topsail Beach > News

Topsail Beach News

Surf City Swing Bridge Maintenance

The NCDOT Bridge Maintenance Unit will be utilizing lane closures for maintenance to the drive system. Eastbound and Westbound lanes closed intermittently. Bridge #16 Surf City Swing Bridge NC50/NC210 .4 Miles N of Junct NC210 Over Intercoastal Waterway. 

Construction Days and Times:
June 23rd through June 26th from 9:00pm until 5:00am.
Actions: E-mail | Permalink |