Advertisement For Bids
Town of Topsail Beach, NC
Hurricane “Irene” FEMA Phase II Nourishment Project

The Town of Topsail Beach is seeking a qualified contractor to perform dredging in Topsail Inlet with placement of material on the developed portion of Topsail Beach.  The Base Bid consists of dredging 650,000 cy of sandy material to deepen Topsail Inlet Channel and a portion of Banks Channel to 16+2 MLW and deepening Topsail Creek to 12+2 MLW.  All work on the Base Bid is inside COLREGS Demarcation Line.  Option A shall include approximately 150,000 cy of dredging to deepen the Outer Bar Channel of Topsail Inlet to 16+2 MLW with beach placement.  Dredge work on Option A is outside COLREGS Demarcation Line and will require UCSG Load Line Certification or approved USCG variance for the intended dredge plant.  Anticipated pipeline lengths are 10,000 to 28,000 feet.  The project must be completed by March 31, 2014.

Plans should be available digitally on, or about, November 4, 2013 and may be obtained by contacting Chris Gibson, PE with TI Coastal, PLLC at PH 910-512-3096 or by e-mail clgibson@ticoastal.com.

Bids shall be accepted by Mr. Tim Holloman, Town Manager, until 4:00PM Tuesday December 3, 2013 at the Topsail Beach Town Hall, 820 S. Anderson Blvd., Topsail Beach, NC 28445, when they shall be opened publicly.  The Town anticipates award and NTP on December 11, 2013.

A pre-Bid meeting shall be held Wednesday, November 20, 2013 2:00PM at the Topsail Beach Fire Department.

 